Fault Recording (GIS)

The GOOSE signals of an IEC 61850 controlled substation contain the trip commands and stamps for the time of opening of the main contacts. These time markers can be used to measure the opening time in the event of a fault. These real fault records are particularly valuable for later analysis, as they are neither generated in a targeted manner, nor are they repeatable.

Expert recommends

DANEO 400

DANEO 400 records and analyses conventional signals, such as voltages, currents, hard wired binary status signals and messages on the communication network in a substation with the same highly accurate time base and can help assess their proper coordination. Multiple units can obtain a time aligned view on signals covering the entire scope of a distributed protection and automation system. All acquisition units are accurately time synchronized. In the event of a fault, the simultaneous or delayed opening of breakers can be accurately analyzed.

Benefits of this solution

>

Videos

Substation Network Supervision with DANEO 400

Get in touch

Need more details? Get a quotation?
Request for a demo?


Contact us now
You are using an outdated browser version.
Please upgrade your browser or use another browser to view this page correctly.
×