November 13 - 14, 2024
China (Hong Kong)
English
oCptr01en
Primary Test Manager (PTM), CPC Family

Online Course: Power transformer diagnostics with the CPC family

November 13 - 14, 2024
China (Hong Kong)
English
oCptr01en
Primary Test Manager (PTM), CPC Family

Summary

After an introduction to the maintenance of transformers, you will expand your knowledge of transformer diagnostics and applications in theory and practice. You will get familiar with the CPC 100 and CP SB1 functions for turns ratio, winding resistance and using the CP TD1 for capacitance or power/dissipation factor measurements. Live demonstrations of practical measurements will enable you to gain immediate understanding of the testing process.

Objectives

  • Get a comprehensive overview of the structure of the transformer insulation, the bushings and the tap-changer
  • Analyze the condition of power transformers to fully exploit the lifetime of your asset
  • Carry out time-optimized tests and diagnostics in the substation, power station or workshop
  • Perform fast, simple and safe condition assessment of your power transformer
  •  

Content

  • Negative influences on the expected lifetime of a transformer
  • Overview of frequent defects in transformer components and their fault patterns
  • Construction of the transformer insulation, the bushings and the tap-changer
  • Common conventional measurement methods such as turns ratio, winding resistance, short-circuit impedance and demagnetization of the transformer
  • Theoretical background to capacity and dissipation/power factor measurements of winding and bushing insulation
  • Automatic execution of three-phase measurements using the Primary Test Manager (PTM) software
  • Evaluation of the measurement results by means of practical examples
  • Assessment of diagnostic measurements and recognize possible defects and influences
  • Analyzing case studies of most common defects on various power transformers
  •  

Duration

2 days

Schedule

Time: 09:30 - 12:00 / 13:30 - 16:00 (GMT+8, Hong Kong Time)

This online training course is hosted by our Training Center Hong Kong S.A.R.
Please check your time zone before registering!

*For this class, we will be using a Cisco Webex solution made available by Cisco Systems Inc. (San Jose, California, USA) to conduct our training sessions. For that purpose, your data submitted in the registration process needs to be forwarded to Cisco.

Audience

Technical staff involved in transformer testing in utilities, transmission, distribution and generation networks, railway grids, service companies and manufacturers.

Prerequisites

Knowledge of electrical engineering

Solutions

CPC 100, CP SB1, CP TD1
Primary Test Manager (PTM)

EUR 500
per person, excludes tax
Register Now

„What really impresses me is the flexibility of the trainer to answer all the questions with the right method for each and every person.“

Student's feedback

Through our courses, you will gain thorough knowledge of assets and applications in electrical power systems.

Application knowledge

Benefit from an efficient mix of live presentations of the device, logically arranged theory content and practical measurements.

Efficient training methods

Our experienced trainer takes your specific questions into account during the training. Every participant has the possibility to discuss questions with the group members and the trainer.

In-depth discussions
3 Alternative Course Dates
May 12 - 13, 2025
Australia (Melbourne)
English
November 20 - 21, 2024
Australia (Melbourne)
English
May 7 - 8, 2025
China (Hong Kong)
English
You are using an outdated browser version.
Please upgrade your browser or use another browser to view this page correctly.
×