6 de octubre de 2022
Reino Unido (Stafford)
inglés
Clin01en
Familia de productos CPC

Line and ground impedance measurements with CPC 100 & CP CU1

6 de octubre de 2022
Reino Unido (Stafford)
inglés
Clin01en
Familia de productos CPC

Resumen

Learn how to connect the test set by following relevant safety procedures. Get familiar with the CP CU1 for line impedance measurements to calculate the settings for protection parameterization as well as for ground impedance and touch potential measurements to assess your grounding systems.

Objetivos

  • Connecting the test set to a power line by following relevant safety procedures
  • Performing line impedance measurement by using the dedicated template
  • Interpreting the results of the line impedance measurement and get the relevant data for the distance relay settings
  • Performing ground impedance as well as step and touch voltage measurements by using the dedicated templates
  • Interpret the results of the ground impedance and step and touch voltage measurements
  •  

Contenido

  • K-factor theory for understanding of relay parameterization
  • Application and usage of the CP CU1 hardware
  • Connection of the test set to the power line
  • Performing and assessing line impedance measurements
  • Derive settings for the distance protection device
  • Performing and assessing ground impedance / step and touch potential measurement
  •  

Duración

1 day

Horario

Day 1: 08:45 a.m. - 05:30 p.m.

Day 2: 09:00 a.m. - 05:30 p.m.

Day 3: 09:00 a.m. - 04:00 p.m.

Información

You will receive a personal email with all course information such as agenda and route directions shortly before the training course.

You can select your desired hotel from our hotel recommendations in UK Training Center83 kB and book it directly according to your preferences.

All training dates are scheduled depending on COVID-19 restrictions at the time of the training taking place, and may be cancelled at any time leading up to the training course.  OMICRON would highly recommend booking any hotels/transport etc which are fully flexible and can be cancelled/amended at short notice.

Audiencia

The Sequencer test card
The dedicated templates for line impedance, ground impedance as well as step and touch voltage measurement
The CP CU1 and CP GB1
The CP AL1
 

Conocimiento previo

Knowledge of electrical engineering

Soluciones

The Sequencer test card
The dedicated templates for line impedance, ground impedance as well as step and touch voltage measurement
The CP CU1 and CP GB1
The CP AL1

GBP 657
por persona, impuestos no incluidos
Seats available

„Qué bueno es cuando los instructores realmente conocen del tema.“

Comentario del estudiante

A través de nuestros cursos, se familiarizará con activos y aplicaciones en sistemas de energía eléctrica.

Conocimiento de la aplicación

Nuestro experimentado instructor incorporará sus preguntas en el programa. Cada participante tendrá la posibilidad de discutir cualquier cuestión que le pueda surgir con otros miembros del grupo y con el instructor.

Discusiones detalladas

Recibirá manuales completos para su posterior consulta.

Material de capacitación profesional
Seats available
Está utilizando una versión de navegador desactualizada.
Por favor, actualice su navegador o utilice otro para ver correctamente esta página.
×