
Partial discharge diagnostics on motors and generators with the MPD series
Resumen
Get an introduction to the basics of partial discharge and to the setup for conventional and unconventional measurements. Learn how to make full use of its software tools for detecting, measuring and documenting partial discharge in primary assets.
Objetivos
- Gaining a better insight into the theory and origin of partial discharge
- Understanding both conventional and unconventional measurement principles
- Performing time-efficient measurements for comprehensive insulation diagnostics on different assets
- Interpreting the measurement results to draw conclusions on the insulation for condition-based maintenance planning
Contenido
- Basics, origin and different types of partial discharge
- Theory about HV breakdown in different insulation systems
- Measurements in time domain and frequency domain (FFT)
- Conventional measurement methods as per IEC 60270:2013
- Measurements with high-frequency current transformers (HFCT) and UHF range
- Applicable standards for PD measurements on different assets
- Offline and online measurement on different assets
- Performing measurement using 3PARD and 3FREQ methods
- Noise suppression techniques for handling of high interference levels (software & hardware approaches)
- Assessment and interpretation of PD patterns for different assets
- Practical measurement examples about calibration, 3PARD, 3FREQ on different assets
- Analysing case studies of most common defects in different assets
Duración
2.5 days
Horario
Day 1: 09:00 a.m. - 17:00 p.m.
Day 1: 09:00 a.m. - 17:00 p.m.
Day 3: 09:00 a.m. - 01:00 p.m.
Información
You will receive a personal email with all course information such as agenda and route directions shortly before the training course.
Price details: The training, the training documents, the refreshments, the snacks, the lunches and one dinner are included.
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
The following course takes place within the same week and might be interesting:
- Comprehensive insulation diagnostics of rotating machines
April 25 - 26, 2024 | Duration: 1,5 Days
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Audiencia
Technical staff involved in the planning or assessment of the condition monitoring of Generators and Motors
Conocimiento previo
Knowledge of electrical engineering
Soluciones
MPD Series and accessories
OMS 605
MPD software with Basic and Advanced package

„Me resulta sorprendente y muy fácil entender la información con ejemplos elaborados por el propio instructor.“