Three Tips for Reducing Wasted Time When Testing Transformers

01 mars 2020

Performing offline electrical tests on transformers can be time-consuming, especially when the field measurements are not captured correctly the first time.

Three timesaving tips to consider:

  • Review the “Power Factor Checklist” Prior to Testing
  • Identify Incorrect Power Factor Measurements Before Leaving the Job Site
  • Select the Appropriate Test Current - DC Winding Resistance
  •  

This article identifies the electrical transformer tests that test equipment users often struggle to perform efficiently and correctly. Three field testing tips will be provided, to address the transformer tests that are often “time-suckers”. By building awareness, test equipment users can better avoid the situations where a significant amount of time is lost due to retesting, troubleshooting, and collaborating with test equipment manufacturers.

Vous utilisez une ancienne version de votre navigateur.
Merci de mettre à jour votre navigateur ou d’utiliser un autre navigateur pour afficher cette page correctement.
×