Circuit Breaker Operation Time (In-Service)

In-service testing methods show degradation accumulated during long idle times better than their off-service counterparts because to prepare a breaker for off-service testing, it has to be operated at least once. For the First trip test method connections are made at the trip coils and the CT’s secondary side. These test methods are very well suited to detected degraded lubricants, contaminated surfaces or corroded mechanical elements.

전문가 추천

CIBANO 500

During a First Trip test, CIBANO measures the opening times by monitoring the CTs’ secondary current (please note that the measured time will include the arcing time).

이 솔루션의 이점

비디오

State-of-the-art circuit breaker testing MV / HV

더 자세한 정보가 필요합니까?
견적을 받고 싶습니까?
데모를 요청하고 싶으십니까?
You are using an outdated browser version.
Please upgrade your browser or use another browser to view this page correctly.
×