Circuit Breaker Operation Time (Off-Service) – AIS

Timing measurements according to IEC 62271-100 are the most common tests on circuit breakers. These tests are used to determine operation time, pole discrepancy or pre-insertion resistor timing. The test uses a resistance or voltage threshold to measure the timing. Methods that allow tests to be performed with grounding on both sides are preferred because of the increased safety of the personnel performing the tests.

전문가 추천

CIBANO 500 + CB MC2

The safety of the test personnel can be increased when the test is performed with both sides of the breaker safely grounded. The offered solution also decreases interferences and reduces the weight of the required test equipment and minimizes handling effort.

이 솔루션의 이점

기타 솔루션

CPX 200

CPX 200 verifies operation times, synchronicity, and contact timings on circuit breakers in a single setup. The motor can be supplied with up to 70V AC / 125V DC from the CPX  200.
CPXpert allows phase-by-phase or interrupter-by-interrupter comparisons within each phase.

비디오

State-of-the-art circuit breaker testing MV / HV

High-voltage circuit breaker testing with OMICRON's CIBANO 500 and CB MC2

Testing circuit breakers with OMICRON's CIBANO 500

더 자세한 정보가 필요합니까?
견적을 받고 싶습니까?
데모를 요청하고 싶으십니까?
You are using an outdated browser version.
Please upgrade your browser or use another browser to view this page correctly.
×