października 6, 2022
angielski
Clin01en

Line and ground impedance measurements with CPC 100 & CP CU1

października 6, 2022
angielski
Clin01en

Podsumowanie

Learn how to connect the test set by following relevant safety procedures. Get familiar with the CP CU1 for line impedance measurements to calculate the settings for protection parameterization as well as for ground impedance and touch potential measurements to assess your grounding systems.

Cel szkolenia

  • Connecting the test set to a power line by following relevant safety procedures
  • Performing line impedance measurement by using the dedicated template
  • Interpreting the results of the line impedance measurement and get the relevant data for the distance relay settings
  • Performing ground impedance as well as step and touch voltage measurements by using the dedicated templates
  • Interpret the results of the ground impedance and step and touch voltage measurements
  •  

Content

  • K-factor theory for understanding of relay parameterization
  • Application and usage of the CP CU1 hardware
  • Connection of the test set to the power line
  • Performing and assessing line impedance measurements
  • Derive settings for the distance protection device
  • Performing and assessing ground impedance / step and touch potential measurement
  •  

Czas trwania

1 day

Termin

Day 1: 08:45 a.m. - 05:30 p.m.

Day 2: 09:00 a.m. - 05:30 p.m.

Day 3: 09:00 a.m. - 04:00 p.m.

Informacje

You will receive a personal email with all course information such as agenda and route directions shortly before the training course.

You can select your desired hotel from our hotel recommendations in UK Training Center83 kB and book it directly according to your preferences.

All training dates are scheduled depending on COVID-19 restrictions at the time of the training taking place, and may be cancelled at any time leading up to the training course.  OMICRON would highly recommend booking any hotels/transport etc which are fully flexible and can be cancelled/amended at short notice.

Audience

The Sequencer test card
The dedicated templates for line impedance, ground impedance as well as step and touch voltage measurement
The CP CU1 and CP GB1
The CP AL1
 

Prerequisites

Knowledge of electrical engineering

Rozwiązania

The Sequencer test card
The dedicated templates for line impedance, ground impedance as well as step and touch voltage measurement
The CP CU1 and CP GB1
The CP AL1

GBP 657
na osobę, bez podatków
Seats available

Pliki do pobrania

Seats available
You are using an outdated browser version.
Please upgrade your browser or use another browser to view this page correctly.
×