목표

  • Get a comprehensive overview of the structure of the transformer insulation, the bushings and the tap-changer
  • Analyze the condition of power transformers to fully exploit the lifetime of your asset
  • Carry out time-optimized tests and diagnostics in the substation, power station or workshop
  • Perform fast, simple and safe condition assessment of your power transformer

내용

  • Negative influences on the expected lifetime of a transformer
  • Overview of frequent defects in transformer components and their fault patterns
  • Construction of the transformer insulation, the bushings and the tap-changer
  • Common conventional measurement methods such as turns ratio, winding resistance, short-circuit impedance and demagnetization of the transformer
  • Theoretical background to capacity and dissipation/power factor measurements of winding and bushing insulation
  • Automatic execution of three-phase measurements using the Primary Test Manager (PTM) software
  • Evaluation of the measurement results by means of practical examples
  • Assessment of diagnostic measurements and recognize possible defects and influences
  • Analyzing case studies of most common defects on various power transformers

기간

2 일

솔루션

  • CPC 100
    • CP SB1
    • CP TD1
  • Primary Test Manager (PTM)
1,160.00 AUD
예약 마감
1인당 (부가세 별도)
지금 등록하기