Recloser Controller
Recloser Controller Testing
Modern recloser controls are powerful, but their growing complexity has made reliable testing more demanding. The need for higher precision, deeper intelligent network integration, smart grid and distributed energy resources (DER), and stricter reliability requirements have all intensified the challenge.
Overcoming these obstacles means performing basic functional checks quickly and handling advanced protection and automated tests with embedded expertise and high-level automation.
Working for a recloser manufacturer requires reliable, efficient test processes you can trust in the lab and production for modern digital controllers.
We design testing solutions that support your daily work.
Solutions for Recloser Controller Testing
Our broad portfolio makes recloser controller testing efficient and straightforward.
The ARCO 400 and dedicated adapters provide an easy-to-use plug-and-play solution for many types of controllers. Combining the CMC 500 and RIR1 lets you perform reliably accurate tests on IntelliRupter® controllers.
The RelaySimTest software lets you validate complex distribution automation schemes with confidence.
The COMPANO 100 gives you maximum field-flexibility for self-powered, single-pole reclosers.
30
+
60
+
+95
%
up to 60
%
Recommended Solutions
Find The Right Solution for Your Application
“After 18 months, we still believe we made the right decision in purchasing ARCO 400. It has enabled us to identify areas where we can improve upon our mission, surpassed our expectations for performance, and holds the potential to be used in the future for testing other devices such as voltage regulator controllers.”
Christian Vermeulen P.E., Cherryland Electric Cooperative
What kind of recloser controllers can be tested?
The ARCO 400 can test:
- Single-pole operated recloser units
- Three-phase gang-operated recloser units
- Pad-mounted recloser units
Combining the CMC 500 with the RIR1 provides a dedicated testing solution for IntelliRupter® control units.
The COMPANO 100 enables you to test self-powered, single-phase recloser units, such as the TripSaver®.
How does recloser control testing help you reduce outages in distribution networks?
When you test your recloser controllers regularly, you’re making sure they’ll operate correctly when a fault occurs. Solutions such as the ARCO 400 allow you to simulate faults, verify settings, and identify issues early.
Combining RelaySimTest with the ARCO 400 and the CMC 500 increases overall system reliability. This setup allows you to test complex distribution automation schemes in realistic conditions.
Proactive testing prevents unexpected malfunctions, improving the reliability of your distribution network.
What are the recommended intervals and best practices for testing recloser controllers?
There is no standard testing interval for recloser controllers. Although the IEEE 1547 guides application and maintenance, it recommends condition-based approaches rather than defined time cycles.
Testing intervals depend on environmental conditions, grid requirements, fault frequency, and controller technology. Typical field practice ranges from 3 to 6 years for comprehensive functional testing, with shorter inspection intervals.
Our solutions support testing throughout an entire lifecycle. They cover a wide range including commissioning testing, regular maintenance testing, and periodic coordination testing.
What protection functions from a recloser controller need to be tested?
Individual distribution grid operators define required protection function tests. Generally speaking, the following protection functions should be tested:
- Overcurrent protection: Monitor pickup values, recloser time/current characteristics, and trip time characteristics to confirm correct fault clearance performance
- Slow curve / fast curve recloser testing: Verify proper coordination and protection curve switching
- Reclosing sequence and timing: Test the number of shots, time intervals, and lockout logic
- Voltage-based restoration schemes: Validate voltage detection and automatic restoration behavior
- Harmonic blocking: Ensure secure operation during inrush conditions
- Anit-islanding: Test voltage and frequency protection, rate of change of frequency (RoCoF), and vector shift
- Communication and automation schemes: Verify proper interaction within your distribution automation system
What role does recloser controller testing play in FLISR distribution automation schemes?
In Fault Location, Isolation, and Service Restoration (FLISR) schemes, your recloser controllers must operate and communicate reliably. You need to ensure that they can respond correctly in real fault conditions.
Testing allows you to verify the control logic, communication links, and switching sequences in realistic fault scenarios. This way, you can make sure your FLISR automation works as intended, isolates faults quickly, and restores service safely and efficiently.
Why are reclosers relevant in Distributed Energy Resources (DER) integration?
Reclosers enable distributed energy resources (DER) to be integrated into the distribution grid. They connect DER to the grid and help manage protection in bidirectional fault-current networks. They also support anti-islanding protection and loss of mains protection. This strengthens the DER protection strategy, improves load management, and reduces outages by quickly and selectively restoring power.
Are the solutions listed on this page limited to recloser controller testing?
No. The CMC 500 and the COMPANO 100 are multifunctional test sets, supporting a wide range of applications that go beyond recloser controller testing. Refer to the respective product page for more detailed information about features and supported applications.
The ARCO 400 is designed for recloser controller testing. It can also test load break switches (LBS) and sectionalizer controls, making it possible to cover multiple assets with a singular dedicated test set.
Interested in a quote?