Monitoring Partial Discharge – On a Temporary Basis #38
In this episode, we expand our earlier discussions about partial discharge (PD) testing and monitoring. Specifically, we talk about the advantages of using temporary online monitoring to trend PD activity and track developing insulation defects between diagnostic measurements.
Joining us for this discussion are OMICRON partial discharge experts Bogdan Gorgan and Patrick Zander. Both have been prior guest experts in Energy Talks episodes about PD testing and monitoring.
Bogdan and Patrick describe the differences between temporary monitoring and diagnostic testing and when temporary monitoring makes sense to keep an eye on PD activity and developing insulation defects. Most importantly, they discuss the advantage of observing PD activity when electrical equipment is in operation. They also explain how PD monitoring and PD diagnosis complement each other to help users completely assess the insulation condition of their electrical assets and make condition-based maintenance decisions.
Lastly, Bogdan and Patrick highlight the OMICRON solutions used for PD testing and temporary PD monitoring and describe the different assessment tools they offer the user.
“Temporary monitoring trends PD activity and tracks developing defects in relation to different operating parameters. However, it does not offer the user many of the tools needed for detailed diagnosis.”
Bogdan Gorgan
PD Testing and Monitoring Expert
“Depending on your maintenance strategy, I would recommend investing in both PD monitoring AND diagnostics for complete assessments.”
Patrick Zander
PD Testing and Monitoring Expert
Mastering OT Cybersecurity Countermeasures in the Power Grid │ Part 1 #135
September 17, 2026
Trustworthy Timing Tests on Both-Sides-Grounded Circuit Breakers #134
September 3, 2026
Bridging the IT and OT Gap: Inside the OWASP OT Top 10 Project #133
August 20, 2026
Beyond Compliance │Part 1: Why Asset History Matters #132
August 6, 2026
Bushing Diagnostics: From Mains Frequency to Advanced Assessment #131
July 23, 2026
Reclosers in Modern Grids: Protection, Automation, and DER Integration #130
July 9, 2026
The Basics of Rotating Machine Testing #129
June 25, 2026
What Makes a Cybersecurity Vulnerability Dangerous? #128
June 11, 2026