Substation Testing: Best Practices to Optimize Asset Management #89
When performing substation equipment testing, expectations are high for a smooth and complete testing process. But how can you ensure testing is carried out efficiently to save time, reduce costs, and provide high-quality results?
In this episode, we speak with Naresh Soni, the founder of Akron Energy in India. His service company provides complete testing, commissioning, maintenance, and condition-based monitoring of substation power equipment in switchyards up to 765 KV all over India. Naresh discusses the critical aspects of substation equipment testing and the importance of optimization to save time and costs while ensuring reliability, safety, and security.
Naresh also shares his insights into the challenges faced in the field, the role of advanced technology and data analytics, and the future trends that will shape substation asset management. He also emphasizes the need for a systematic approach to testing and the adoption of innovative tools to enhance efficiency, safety, and security.
Interested in this topic? Be sure to listen to the following previous episodes of Energy Talks:
“Time optimization is essential to prevent equipment breakdowns.”
Naresh Soni
Founder Akron Energy Private Ltd.
Mastering OT Cybersecurity Countermeasures in the Power Grid │ Part 1 #135
September 17, 2026
Trustworthy Timing Tests on Both-Sides-Grounded Circuit Breakers #134
September 3, 2026
Bridging the IT and OT Gap: Inside the OWASP OT Top 10 Project #133
August 20, 2026
Beyond Compliance │Part 1: Why Asset History Matters #132
August 6, 2026
Bushing Diagnostics: From Mains Frequency to Advanced Assessment #131
July 23, 2026
Reclosers in Modern Grids: Protection, Automation, and DER Integration #130
July 9, 2026
The Basics of Rotating Machine Testing #129
June 25, 2026
What Makes a Cybersecurity Vulnerability Dangerous? #128
June 11, 2026