Onsite Partial Discharge Testing on Power Transformers #7
Power transformers are a key element of the electrical grid, and they are continuously subjected to different levels of electrical, thermal, mechanical, and chemical stress during service.
To ensure reliable and safe operation, it is key to assess the condition of the insulation system during a transformer’s life cycle.
Partial discharge (PD) measurements, for example, are a highly effective and non-destructive tool for the detection, assessment, and localization of insulation weak spots, which could eventually lead to transformer failure.
In this episode, OMICRON PD measurement experts Michael Krüger and Udo Ranninger describe not only the importance of onsite PD testing on both oil-filled and dry type power transformers, but also how it is performed to effectively pinpoint insulation defects not revealed by other tests, including Dissolved Gas Analysis (DGA). An actual PD measurement case study is presented to illustrate these points.
“Whenever asked to check power transformers on site, you should always include PD testing.”
Michael Krüger
Asset Expert
“Comparing electrical and acoustic PD measurements helps you to pinpoint defect locations.”
Udo Ranninger
Application Specialist
Mastering OT Cybersecurity Countermeasures in the Power Grid │ Part 1 #135
September 17, 2026
Trustworthy Timing Tests on Both-Sides-Grounded Circuit Breakers #134
September 3, 2026
Bridging the IT and OT Gap: Inside the OWASP OT Top 10 Project #133
August 20, 2026
Beyond Compliance │Part 1: Why Asset History Matters #132
August 6, 2026
Bushing Diagnostics: From Mains Frequency to Advanced Assessment #131
July 23, 2026
Reclosers in Modern Grids: Protection, Automation, and DER Integration #130
July 9, 2026
The Basics of Rotating Machine Testing #129
June 25, 2026
What Makes a Cybersecurity Vulnerability Dangerous? #128
June 11, 2026