It’s Quieter Up Here – Partial Discharge Testing in the UHF Range #29
In this episode of Energy Talks, you will find out how partial discharge (PD) measurements performed in the ultra-high frequency (UHF) range can be a reliable alternative or complementary PD detection approach in noisy onsite testing environments.
The conventional method for PD measurement according to the IEC 60270 standard allows a precise calibration but requires a sufficiently high signal-to-noise ratio (SNR) in the measurement circuit – this is however very difficult to obtain when performing PD measurements on site.
OMICRON PD application expert Ulrike Broniecki discusses how PD testing in the UHF range – such as with our UHF 800 system – can help you obtain a better measurement signal-to-noise ratio for reliable insulation condition assessment and defect detection in noisy testing environments. She also highlights the benefits of using the UHF PD measurement method on gas-insulated switchgear (GIS), gas-insulated lines (GIL), oil-filled transformers and high-voltage power cable terminations.
“Sensitive PD measurements allow you to better assess the actual condition of the insulation system.”
Ulrike Broniecki
PD Applications Expert, OMICRON
Mastering OT Cybersecurity Countermeasures in the Power Grid │ Part 1 #135
September 17, 2026
Trustworthy Timing Tests on Both-Sides-Grounded Circuit Breakers #134
September 3, 2026
Bridging the IT and OT Gap: Inside the OWASP OT Top 10 Project #133
August 20, 2026
Beyond Compliance │Part 1: Why Asset History Matters #132
August 6, 2026
Bushing Diagnostics: From Mains Frequency to Advanced Assessment #131
July 23, 2026
Reclosers in Modern Grids: Protection, Automation, and DER Integration #130
July 9, 2026
The Basics of Rotating Machine Testing #129
June 25, 2026
What Makes a Cybersecurity Vulnerability Dangerous? #128
June 11, 2026