Need more details?
Get a quotation?
Request for a demo?

CP SB1
Switch box for fully automatic testing of three-phase power transformers
Change cookie settings to load video. Allow marketing cookies.
Simplified and safer testing
The CP SB1 is an accessory for the CPC 100 and simplifies measurement of three-phase power transformers.
The switchbox CP SB1 reduces wiring work at power transformers. Thereby, the time needed for testing can be reduced and, at the same time, safety can be significantly increased.
The transformer ratio and winding resistance are automatically measured in all three phases (in sequence) in all tap changer positions. The measurement results are recorded by the CPC 100 and can be analysed with the accompanying software package.

Key features
- Time saving: Rewiring no longer necessary
- Safety: one-time connection of cables
- Minimization of measurement errors: Fully automated testing

- For every tap changer position the transformer ratio and winding resistance can be measured



Solution for:
Documents
Papers & Articles
Change cookie settings to load video. Allow marketing cookies.
Videos
Change cookie settings to load video. Allow marketing cookies.
Power Transformer Testing - Automatically measuring ratio and winding resistance of all taps/phases
Products
Get in touch
Need more details?
Get a quotation?
Request for a demo?
Contact us now