You have disabled JavaScript. Please enable JavaScript to make use of all the features we offer.
Sensitive Partial Discharge Measurements in Noisy Testing Environments
Register Now for the Joint Webinar with IFE Norway on May 31, 2022
Automated Testing of Interlockings and SCADA Communication with StationScout 2.10
VOTANO 100 2.30 Software Version Available
PTM 4.90 Software Version Available
OMICRON Magazine Issue 1/2022 available
Ensuring the Reliability of Underground Cable Systems
Meet Our New IT Partner NTS
Cybersecurity in Digital Substations
OMICRON European Protection Symposium: Advanced Testing for Optimal Efficiency
New Protection Test Templates in PTL available
Protection Testing Online Series
No Log4j vulnerability in OMICRON products
RelaySimTest 4.00 - Small-sized Interactive System Simulation
MPD Suite Software Version 1.20 Adds More Partial Discharge Testing Features
Experience the OMICRON Customer Care Center
In the Shoes of Field Engineers | Testing Instrument Transformers
with Marcus Stenner
Episode 32 - Energy Talks
Digital Transformation in the Power Industry 3 | Cyber Security
with Thomas Friedel & Eugenio Carvalheira
Episode 31 - Energy Talks
Preventing Disaster: Wildfire Mitigation at Electric Utilities
with Robert Wang & Justin Henson
Episode 30 - Energy Talks
A protection engineer’s mission – accomplished with the new CMC 430
COMPANO 100 - Battery operated testing tool for basic protection tasks
GIS Timing Test with CIBANO 500 Current Sensor
Route to IEC 61850 (2017): How IEC 61850 testing features support functional testing
In the Shoes of Field Engineers | Testing Instrument Transformers - Energy Talks #32
OMICRON South Asia Protection and Testing Conference
Digital Transformation in the Power Industry 3 | Cyber Security - Energy Talks #31
Capacitor Voltage Transformer with VOTANO 100: New Method to measure the capacitances
What is New in VOTANO 100 Version 2.30
Preventing Disaster: Wildfire Mitigation at Electric Utilities - Energy Talks Podcast #30
CIBANO 500 - Testing a four interrupter per phase circuit breaker without rewiring
Primary Test Manager™ 4.90 release « What’s New »
It’s Quieter Up Here – Partial Discharge Testing in the UHF Range - Energy Talks Podcast #29
Digital Transformation in the Power Industry 2 | Challenges - Energy Talks #28