Whitepaper - How to Verify IEC 61850 to IEC 104 Translations Without Physical IED
This whitepaper explores the fundamental shift in substation automation testing from hardware-dependent setups to virtualized, software-defined verification. By utilizing Soft-RTUs and IED simulation within virtual machines, engineers can validate complex IEC 61850 to IEC 104 protocol translations and HMI signal mappings without the need for physical hardware or extensive lab environments.